WELCOME TO OUR BLOG

We're sharing knowledge in the areas which fascinate us the most
click

Why Fish Cage Nets Fail During Lifting Instead of Underwater

By plfishery August 12th, 2026 80 views
Catalog

Why Fish Cage Nets Fail During Lifting Instead of Underwater

A fish cage net may remain in service for months without any obvious structural failure.

Then, during cleaning, harvesting, inspection, or replacement, the net is lifted—and suddenly:

  • An attachment loop breaks

  • A border rope tears

  • A seam opens

  • A corner fails

  • Several meshes rupture

This often surprises operators because the net appeared stable underwater.

But lifting creates a very different load condition from normal submerged service.

The key principle is:

A fish cage net that survives underwater loads may still fail when its wet mass and fouling load are concentrated into a limited number of lifting points.


1. Underwater and Lifting Loads Are Different

During normal service, the net is supported by a combination of:

  • Frame attachments

  • Sinker systems

  • Water

  • Multiple border connections

Forces are distributed through a large structure.

During lifting, much more of the total load can be transferred through:

  • A few lifting loops

  • Upper borders

  • Corners

  • Temporary ropes

  • Crane or winch connections

This changes the load path dramatically.


2. Water Reduces Apparent Weight Underwater

Submerged objects experience buoyancy.

The net does not feel exactly the same underwater as it does when lifted into air.

Once the net leaves the water, buoyant support decreases.

The lifting system must then carry more of the actual mass.

This difference becomes much more important when the net is heavily fouled.


3. A Wet Net Is Heavier to Handle Than a Clean Dry Net

When lifted, the structure can carry:

  • Surface water

  • Water trapped between strands

  • Water inside folds

  • Water held by fouling

This temporary mass adds to the lifting load.

For PE netting, this should not simply be described as the polymer “absorbing water.”

Much of the added handling weight comes from water retained on and within the complete net structure.


4. Biofouling Can Multiply the Lifting Burden

A cage net may accumulate:

  • Algae

  • Mussels

  • Barnacles

  • Slime

  • Sediment

These materials add significant mass.

They also trap more water during lifting.

A net that was easy to handle when new may become much more demanding after months in service.


5. Fouling Is Rarely Distributed Evenly

One part of the cage may carry much more marine growth than another.

During lifting, this creates:

  • Uneven weight

  • Panel twisting

  • Different border tension

  • Overloaded lifting points

The heaviest zone may pull one corner downward while the opposite side remains relatively light.


6. Lifting Concentrates Load Into Fewer Points

Underwater, hundreds or thousands of meshes help distribute force.

During lifting, the entire panel may depend on only a few connections.

For example, a large cage net may be lifted by:

  • Four corners

  • Several upper loops

  • One temporary lifting rope

Each connection suddenly carries a much greater share of total load.


7. Attachment Loops Often Become the First Weak Point

Lifting loops concentrate load into small structural zones.

Their performance depends on:

  • Loop material

  • Diameter

  • Knot or splice

  • Border connection

  • Bend radius

  • Hardware

A strong main panel can remain intact while the loop fails first.


8. Small Hardware Can Increase Local Stress

A thick lifting loop wrapped around a small metal ring must bend sharply.

This creates:

  • High contact pressure

  • Flattening

  • Abrasion

  • Internal fiber stress

The problem becomes more severe when the load increases suddenly.


9. Border Ropes Carry More Load During Lifting

The upper border may normally help maintain panel geometry.

During lifting, it can become a primary structural member.

If the border has:

  • Abrasion

  • Old splices

  • Uneven lacing

  • Local damage

the increased lifting load can expose these weaknesses immediately.


10. Corners Experience Multi-Directional Forces

Corners already combine:

  • Vertical borders

  • Horizontal borders

  • Loops

  • Reinforcement

During lifting, they may also carry a large share of the net mass.

This makes them critical inspection points before any lifting operation.


11. Seams Can Open During Lifting

A seam may perform well underwater when panel tension is distributed.

During lifting, the seam may become a major load-transfer line.

If the joining twine or adjacent mesh has aged, the seam may:

  • Separate

  • Pull neighboring knots

  • Tear the first mesh row beside it

The seam itself is not the only area that should be inspected.


12. The First Mesh Rows Beside Reinforcement Can Fail

Reinforced areas are often stronger and stiffer.

During lifting, load may move from a hard border or seam into softer main netting.

This creates a stiffness transition.

Failure may occur one or two mesh rows away from the reinforcement rather than inside it.


13. Lifting Can Create Dynamic Shock Loads

A net is not always lifted smoothly.

Possible events include:

  • Crane acceleration

  • Winch jerking

  • Wave movement

  • Rope slack suddenly becoming tight

These create short-duration peak forces.

A structure that tolerates steady load may fail under a sudden shock.


14. Waves Make Lifting More Dangerous

If lifting is performed while the cage moves with waves, the suspended net may move vertically.

The lifting rope can repeatedly:

  • Tighten

  • Relax

  • Snap tight again

This cyclic loading increases stress on connections.


15. Partial Lifting Can Be Worse Than Full Support

Sometimes one side of the cage is raised first.

The remaining net hangs from a small number of points.

This can create severe local tension.

A gradual, balanced lifting method is usually structurally safer than pulling one corner far ahead of the others.


16. Trapped Water Can Create Temporary Heavy Pockets

Folded netting can form pockets.

Water may remain trapped temporarily.

This creates localized downward loads.

A lifting point near the pocket may suddenly carry much more force than expected.


17. Debris Can Add Unexpected Load

The net may contain:

  • Seaweed

  • Wood

  • Plastic

  • Fishing gear

  • Sediment

These materials may not be visible before lifting.

Once the net rises, they can collect in folds and increase local load.


18. Bottom Panels Can Become Extremely Heavy

The bottom section often accumulates:

  • Sediment

  • Shells

  • Feed residue

  • Fouling

When the cage is lifted, this material moves toward the lowest hanging area.

The bottom panel can therefore become a concentrated load zone.


19. Sinker Systems Must Be Managed Before Lifting

If heavy sinkers remain connected while the net is raised, the lifting system may carry both:

  • Net mass

  • Sinker load

This can greatly increase border and loop tension.

The lifting procedure should account for the actual sinker configuration.


20. Uneven Sinker Removal Can Twist the Cage

Removing ballast from one side first can leave the opposite side heavily loaded.

This may create:

  • Diagonal tension

  • Panel twisting

  • Corner overload

Balanced preparation matters before the net leaves the water.


21. Old Abrasion Damage May Only Reveal Itself During Lifting

A twine worn against a frame may still survive normal underwater loading.

During lifting, the same section suddenly carries much greater tension.

The weakened area then breaks.

The lifting event may be the immediate cause, but previous abrasion is the underlying damage.


22. UV-Aged Upper Sections Are Especially Important

Upper borders and loops may experience:

  • Sunlight

  • Wave action

  • Wet-dry cycling

  • Frequent handling

These areas are also commonly used for lifting.

Their remaining strength may be lower than when the net was new.


23. Repairs Can Change the Load Path

A repaired area may be:

  • Stiffer

  • Heavier

  • Stronger than nearby old mesh

During lifting, force may bypass the patch and concentrate beside it.

Repeatedly repaired panels deserve extra inspection before handling.


24. Lifting From the Wrong Points Can Damage a Good Net

Not every attachment point is designed to carry the entire panel weight.

Using ordinary installation loops as lifting eyes can overload them.

The net design should clearly distinguish between:

  • Installation attachments

  • Structural lifting points

where applicable.


25. Never Assume All Loops Have Equal Capacity

Loops may differ in:

  • Wear

  • Length

  • Knot condition

  • Hardware contact

  • UV exposure

Even if they were identical when new, service conditions can make them different later.

Inspect each lifting point.


26. Check for Unequal Load Before Leaving the Water

During early lifting, observe whether:

  • One rope becomes tight first

  • One corner rises faster

  • One side remains slack

  • The panel twists

These are signs of uneven load sharing.

Correcting the imbalance early can prevent damage.


27. Stop if the Net Forms a Heavy Local Pocket

A deep fold full of:

  • Water

  • Fouling

  • Debris

can create severe concentrated load.

Redistribute or drain the section according to safe operating procedures rather than continuing to increase tension.


28. Inspect the Net Before Lifting

High-risk areas include:

  • Upper borders

  • Corners

  • Attachment loops

  • Seams

  • Previous repairs

  • Hardware-contact zones

Look for:

  • Fuzzing

  • Flattening

  • Cuts

  • Loose knots

  • Corrosion damage

  • Abrasion

A pre-lift inspection is often more useful than discovering damage after failure.


29. Cleaning Before Major Lifting Can Reduce Load

Where operationally appropriate, reducing heavy fouling before full lifting can lower:

  • Net mass

  • Retained water

  • Hydrodynamic resistance

However, cleaning must not damage the net itself.


30. Use More Load-Sharing Points Where the Design Allows

Distributing lifting force across more suitable points can reduce concentration.

The goal is to spread load through the structure instead of forcing a few loops or corners to carry everything.

Any lifting arrangement should follow the engineered net and cage design.


31. Lift Gradually

Smooth lifting helps reduce sudden peak loads.

Avoid unnecessary:

  • Jerking

  • Rapid acceleration

  • Slack-to-tight impacts

Controlled motion gives the structure time to redistribute load.


32. Monitor Borders During the Lift

Watch for:

  • Sudden straightening

  • Strong local tension

  • Knot movement

  • Lacing distortion

These can indicate that one structural path is becoming overloaded.


33. A Net That Survives Lifting Still Needs Inspection

Lifting can create damage without immediate rupture.

After handling, inspect for:

  • New fuzzing

  • Flattening

  • Stretched mesh

  • Loose seams

  • Damaged loops

A successful lift does not mean nothing changed.


34. Record Repeated Damage Locations

If the same corner or lifting point repeatedly requires repair, the issue may be systemic.

Possible causes include:

  • Poor lifting geometry

  • Inadequate reinforcement

  • Small hardware

  • Uneven load distribution

Repeated patching alone may not solve the problem.


Practical Pre-Lifting Inspection Checklist

Before lifting:

✔ Check fouling level
✔ Estimate wet handling load
✔ Inspect lifting points
✔ Check attachment loops
✔ Inspect borders
✔ Inspect corners
✔ Check seams
✔ Review previous repairs
✔ Check sinker configuration
✔ Remove trapped debris where practical

During lifting:

✔ Lift gradually
✔ Keep load balanced
✔ Watch for twisting
✔ Monitor tight and slack lifting lines
✔ Avoid shock loading
✔ Watch for heavy water pockets
✔ Monitor border tension

After lifting:

✔ Inspect loops again
✔ Check border damage
✔ Look for new mesh distortion
✔ Inspect seams
✔ Record new abrasion
✔ Document failed or overloaded zones


Conclusion: Lifting Turns a Distributed Net Into a Concentrated Load System

Fish cage nets can survive normal underwater operation but fail during lifting because the structural conditions change dramatically.

The major reasons include:

  • Loss of buoyant support

  • Wet retained water

  • Heavy biofouling

  • Concentrated lifting points

  • Dynamic shock loads

  • Uneven sinkers

  • Old abrasion

  • Weak loops, borders, seams, or corners

The key principle is:

The Net May Be Strong Enough for Its Underwater Operating Load but Not for an Uncontrolled Lifting Load Concentrated Through a Few Connections.

Reliable lifting preparation combines:

Pre-Lift Inspection + Fouling Assessment + Balanced Load Sharing + Suitable Lifting Points + Controlled Motion + Post-Lift Inspection

At PL Fishery, we manufacture PE fishing nets, fish cage panels, aquaculture netting, reinforced borders, attachment loops, custom seams, repair mesh, repair twine, marine ropes, chicken nets, and customized net products.

To purchase or customize fish cage netting, send PL Fishery your mesh size, twine construction, cage dimensions, border design, attachment and lifting-point requirements, sinker system, expected fouling conditions, handling method, and inspection requirements so our factory can prepare a measurable production specification.https://plfishery.com/

Leave a message
Name
Email *
Message
Message Us